Sorry for the hiatus, works been super busy. So Ive been compiling parts before I strip it down and send things to powder and my top end to rich at dyno port. Got some +2 full flight arms, and elkas on order . But they’re like 16 weeks out… using some rpm billet ltr450 hubs, spindles and brakes. Picked up a fmf pipe (all I could find, for now). Also switched to some spare hubs from one of my atc’s . Gave me 1.75 inches extra per side with 4/110 bolt pattern.