The bar wear its rusted need to be pushed together more untill the 2 holes for u bolt is center on frame. On both sides. Then slide nerf bar alloy part till the hole lines up where you put the bolt that connects rusted bar to alloy nets. Then they bolt at the pegs. These never came with tabs. Just have to weave them threw their holder right.