Throttle cable from motion pro for my dual gasser shipped yesterday. Hit my cases with a couple coats of black enamel yesterday as well. Gonna finish painting today and cut the aluminum for my air box today as well should be welded up in a day or two for free by one of the fab guys at my dads work. Still waiting on my cylinder head and once I get it from MHR still have to have it cut for o rings locally. Then it's leak down test address any leaks remount engine connect fuel lines and electrics and first fire. Not much left to do if only my cylinder head didn't take over a month to get sent out once it was realized I received the wrong one.
Good news is every drag race locally has been rained out so I still may make the first race if the season at the local strip!