Woww!!!
I graduated from RHS in 2000. I used to live up on Zimmerman, and two places on Doan near the volunteer firestation and larson. I still go there sometimes to hang out, and we hit the back roads down Arpairy to Bunker hill. Shhh! Not permitted but we don't cause issues, we just go ride and hang out.
I tried sending him emails, contacting thru his facebook, etc. Guess I could pick up a phone hahaha, who'da thunk :|
Anyways, here are some picture I took for you about the front bar. Def looks like someone who wasn't skilled with a welder got ahold of this and did it, while they line up fine and it bolts together the welds don't look that appealing even under the paint.
Enjoy, PS. If you need/want more pictures I will take any you need. Just need a specific. I tried getting one of the top, bottom, and where it bends. Top end is done, she runs, check video. Sounds ok. I need to get the valve stem fixed in the rear paddle then take her for a spin at the local spot. If you guys want my cell let me know, i respond faster via texts as sometimes forget to check the site.
PSS, Don't mind the finger. Not directed at you. It's a salute to my datsun buddies. I just noticed a pic or two was dark, let me know if you need me to retake those as well. And last but not least, the bar with the cut in it. That's so it can fit the left bend pipe. I am thinking about filling it up, then adding a gusset or two. Time will tell, motor needs done first, then details.






