Should be getting the neck and triple trees sometime soon. Waiting to cut the frame until after i get the parts in. To make sure the frame doesnt sag down i think i will leave the down tube in it until after i've got the front end tacked up. Then i'll get a cradle bent up and a beefier down tube fabbed in. Then i'll have to find somewhere to send the frame to get finished welded.
Two big hurdles right now are the tank and pipe. The pipe is just a matter of finding someone that can make a pipe to fit the custom frame that wont get into the front tire. The tank is a matter of finding one that flows with the seat right, isn't ridiculously hard to find/expensive and that has the inside pocket/latch/things in the front. I'll give the tanks that iceracer said a look over to see how they would fit and work.