Same engine same day, I should add all runs were on a Dynojet eddy current 188 machine. we spent about 10 hours on the machine that day. Each pipe was run through all the same variations, power valve changes jetting changes etc untill we had optimised each pipe. Pipes were all run from 3/4 - 2 turns on powervalve.
Red is Dynoport
Blue is Ftz